1. MARKIČ, Simona, JELEN, Bojan, PERIŠIĆ, Mirko. Middle term plan in brown coal mine Trbovlje-Hrastnik. In: PUCHKOV, L.A. (ed.). 2nd regional APCOM `97 symposium on computer applications and operations research in the mineral industries : Moscow, August 24-28, 1997. Moscow: The Moscow state mining university publishing center, 1997. Str. 92-102. ISBN 5-7418-0120-X. [COBISS.SI-ID 106723]
2. VEBER, Igor, MARKIČ, Simona, PERIŠIĆ, Mirko. Short term mine planning, considering the sulphur content in the coal, regarding steam power plant emissions and environment protection. In: KRISTEV, Boris (ed.), GOLOMEOV, Blagoj (ed.). 6th Balkan conference on mineral processing. Ohrid, Macedonia, 18-21.9.1995 : proceedings. [s. l.]: [s. n.], 1995. Str. 523-536. [COBISS.SI-ID 106979]
3. MARKIČ, Simona, LUIS, Robert, PERIŠIĆ, Mirko. Short term planning of ore homogenization in mine production. Case study: The Anhovo cement plant. In: KRISTEV, Boris (ed.), GOLOMEOV, Blagoj (ed.). 6th Balkan conference on mineral processing. Ohrid, Macedonia, 18-21.9.1995 : proceedings. [s. l.]: [s. n.], 1995. Str. 553-568. [COBISS.SI-ID 107235]
4. KOVAČ, Ivan, MARKIČ, Simona, GLUŠČEVIČ, Branko. Contribution to the estimation of ore reserves and production planning of small deposits - case study: a bauxite deposit. In: PERIŠIĆ, Mirko (ed.), ŠUBELJ, Andrej (ed.). 1st Regional APCOM Symposium on Applications of Computers and Operations Research in the Mineral Industries, Bled, Slovenia, 20. - 23. 6. 1994. [Ljubljana]: Organizacijski odbor za "1st Regional APCOM Symposium", 1994. Str. 96-104, ilustr. [COBISS.SI-ID 68543744]
5. HRIBAR, Jože, JELEN, Bojan, MARKIČ, Simona. A contribution to the planning of optimal excavation parameters in the Velenje lignite mine. In: PERIŠIĆ, Mirko (ed.), ŠUBELJ, Andrej (ed.). 1st Regional APCOM Symposium on Applications of Computers and Operations Research in the Mineral Industries, Bled, Slovenia, 20. - 23. 6. 1994. [Ljubljana]: Organizacijski odbor za "1st Regional APCOM Symposium", 1994. Str. 512-519, ilustr. [COBISS.SI-ID 68549120]
6. MARKIČ, Simona, ANDRIĆ, Ljiljana. Increased reliability of estimating and planning small, limited mines case study: Poljanica coal mine. In: PERIŠIĆ, Mirko (ed.), ŠUBELJ, Andrej (ed.). 1st Regional APCOM Symposium on Applications of Computers and Operations Research in the Mineral Industries, Bled, Slovenia, 20. - 23. 6. 1994. [Ljubljana]: Organizacijski odbor za "1st Regional APCOM Symposium", 1994. Str. 75-84, ilustr. [COBISS.SI-ID 68542208]
7. PURIČ, Stevo, MARKIČ, Simona, PERIŠIČ, Mirko. Estimation of permeability coefficient using the cokriging method and calculation of tendency factor. In: NĚMEC, Vaclav (ed.). Matematicke metody v geologii : hornicka Přibram ve vědě a technice : řijen 1993. [Praga: s.n.], 1993. 7 str. (ma 6). [COBISS.SI-ID 114403]
8. MARKIČ, Simona, TASIČ, Meta, PERIŠIČ, Mirko. Underground long-term planning by using the parametrization and estimation of conditional longnormal probability distribution in Mežica Pb-Zn mine (Slovenia). In: NĚMEC, Vaclav (ed.). Matematicke metody v geologii : hornicka Přibram ve vědě a technice : řijen 1993. [Praga: s.n.], 1993. 12 str. (mb 5). [COBISS.SI-ID 115171]
9. MARKIČ, Simona, PIRTOVŠEK, Darko, PERIŠIĆ, Mirko. Separated kriging and stochastic simulation in planning and coal content production control. In: KIM, Y.C. (ed.). 23rd international symposium application of computers and operations research in the mineral industry : [Tucson], April 7-11, 1992. Littleton: Society of mining, metallurgy and exploration, 1992. Str. 199-204. ISBN 0-87335-110-X. [COBISS.SI-ID 111075]
10. PERIŠIĆ, Mirko, LOGAR BOČKO, Sanja, MARKIČ, Simona. Anwendung der "Soft-Kriging-Methode" im Frühstadium der Bewertung einer Kohlelagerstätte mit schwierigen geologischen und tektonischen Eigenschaften = Application of the soft kriging method in initial estimation of a coal deposit with difficult geological and tectonic characteristics. In: 22. Internationales Symposium APCOM, Berlin, 17.- 21.9. 1990 = 22. international symposium APCOM, Berlin, 17.- 21.9. 1990 = 22. meždunarodniji simpozium APCOM, Berlin, 17.- 21.9. 1990. Berlin: Technische Universität Berlin, 1990. 2. zv., str. 727-737. TUB-Dokumentation, Kongresse und Tagungen, Heft 51, Band I, Band II, Band III. ISBN 3-7983-1374-1. [COBISS.SI-ID 111587]